Labour and Immigration

Permits


Permits must be obtained prior to commencement of all alterations, additions or installations of gas piping or equipment

Drawings in triplicate must be submitted with all applications where the total input of all units to be connected exceeds 400,000 BTU per hour.

Only licensed person can submit an application to work on gas and oil fired appliance/equipment.

For information on how to apply for a permit to install gas or oil burning equipment, who can apply for a permit, and the requirements to install pressure piping systems, please contact Gas Permit Clerk at 204-945-1359

Related Documents available on the Bulletins, Guides & Forms page: